State Agency · Department of Water Resources
Stream Gage Improvement Program
Last updated: September 7, 2026
Department of Water Resources
Funding
Funding amount not specified
Closes
December 31, 2024
NAICS
237
Similar grants still open
- Cooperative Agreement for Affiliated Partner with the Alaska Cooperative Ecosystem Studies Unit (CESU)Geological Survey · closes September 11, 2026
- Cooperative Agreement for Affiliated Partner with the Gulf Coast Cooperative Ecosystem Studies Unit (CESU)Geological Survey · closes September 11, 2026
- Cooperative Agreement for Affiliated Partner with the Californian Cooperative Ecosystem Studies Unit (CESU)Geological Survey · closes September 12, 2026
- NSF Dynamic Language Infrastructure - NEH Documenting Endangered LanguagesU.S. National Science Foundation · closes September 15, 2026
- U.S. Wildland Fire Service BLM-National Interagency Fire Center (NIFC) Joint Fire Science Program (JFSP) Primary AnnouncementBureau of Land Management · closes September 17, 2026
- National Estuarine Research Reserve System (NERRS) Land Acquisition and Construction Program for Fiscal Year 2026DOC NOAA - ERA Production · closes September 18, 2026
- FY 2026 Competitive Funding Opportunity: Grants for Buses and Bus Facilities Infrastructure ProgramsTransportation Department · closes September 21, 2026
- Advancing Oil and Natural Gas Production and DeliveryNational Energy Technology Laboratory · closes September 22, 2026
To be eligible for the CalSIP funding, projects must provide real-time stream data to the public stream gage network through the California Data Exchange Center (CDEC). Eligible projects need to provide data to inform at least one program water management areas (e.g., flood, water quality, water supply, ecosystem).Eligible gaging sites must:• Be on natural waterways within California (not on canals or diversion ditches where flows are controlled by diversion structures where primary function is for conveyance and distribution of surface water). • Provide telemetered real-time stream gage data (15-minute intervals). The measurement and reporting of the stage (water surface elevation in feet, North American Vertical Datum of 1988 [NAVD88]), flow (discharge in cubic feet per second), and water temperature in F, are preferred.• Have an operational gage by October 1, 2026.Projects and locations not eligible for CalSIP funding include: • Canals or waterways developed and maintained for water delivery,non-natural waterways. • Operations and maintenance (O&M) for current stations.Examples of projects that meet the intent of CalSIP are provided in Table 1. This list is not exhaustive; other projects can be considered at the discretion of DWR. Proposed gage locations are not limited to the priority watersheds identified in the SB 19 Plan; sites located outside of SB 19 priority watersheds are eligible.
Eligibility
- Programs related to infrastructure
- Programs related to bridge
- Programs related to watershed
Award details
Applications close on December 31, 2024.
Categories
Infrastructure
This grant is no longer accepting applications. Get matched to open grants like it, or browse the ones above.
See similar open grants ↑Applications closed — listing kept for reference.·Source: California Grants Portal·Last seen Sep 7, 2026
